-10-
X. PROCEDURES & ADJ. (cont’d)
X. f-SYSTEM CLEAN UP/INTRODUCTION
MASSIVE CONTAMINATION (cont’d):
NOTE: The replacement compressor MUST NOT be
installed until after system clean-up procedures have
been completed.
1) Remove the burned-out compressor as outlined under
“COMPRESSOR”.
2) Remove the capillary tube metering device.
3) Purge nitrogen through the high and low sides of
system until moisture and contaminated oil has been
removed from the remaining components of the
system.
4) Reassemble refrigeration system and add a CW style
liquid drier and a suction line drier.
5) Purge nitrogen through the high and low sides of
system for 5 minutes.
6) Evacuate refrigeration as outlined under
“EVACUATING SYSTEM” for 30 minutes. Repeat
nitrogen purge and evacuate two more times.
7) Charge system as outlined under “CHARGING
SYSTEM”. Allow for the increased liquid capacity of
the liquid line drier.
8) Reconnect power and check for proper operation.
9) Disconnect power and install any panels removed.
10) Return between 24 and 48 hours to recover gas,
replace liquid line drier with a CW style drier. Remove
the suction drier, but do not replace.
11) Evacuate and charge system as outlined under
“EVACUATING SYSTEM” and “CHARGING SYSTEM .
X. g-HEATER TEST-DRAWER PERIMETER HEATER:
1) Access the orange heater power wire connected to
terminal #4 of the relay module.
2) Plug the unit in and verify 120vac supply to heater
from the orange heater power wire.
3) Check for nominal amp draw (.25-.5 amps).
4) Disconnect power, check for continuity using an Ohm
meter from the orange heater wire to neutral.
XI. a-NORMAL OPERATION:
1. Conditions
a) Unit connected to correct voltage (check using a volt me-
ter).
b) Microprocessor off cycle defrost settings correct.
c) Condensing unit controlled by the microprocessor control.
d) Cabinet at desired temperature.
e) Door perimeter heaters are powered 100% of the time as pre-
set by the factory (this can be adjusted using the microprocessor
control).
f) Evaporator fan powered.
g) Microprocessor control operating correctly.
2. Cabinet temperature rises above set temperature.
a) Microprocessor control initiates compressor
operation.
b) Evaporator fan should be ON all the time.
3. Set temperature is met.
a) Conditions return to those outlined in step 1.
XI. b-DEFROST MODE:
1. Conditions
a) Unit operating in normal mode.
2. Defrost is initiated by the microprocessor control (an off-cycle
defrost should occur every 60 minutes for refrigerators or a hot
gas defrost every 4 hours for freezers.
3. Defrost terminated by either: 1) Evaporator Coil
Temperature or 2) Maximum Set Time Interval.
4. Cabinet returns to normal operation.
a) Temperature controlled by the microprocessor
control.
b) Evaporator fan stays ON, evaporator coil will reach
desired temperature.
XI. ELECTRICAL OPERATION
Certain procedures in this section re-
quire electrical test or measurements while power is
applied to the machine. Excercise extreme caution
at all times. If test points are not easily accessible,
disconnect power, attach test equipment and reapply
power to test.